1. Fabric Accessory Inspection Process
Durable Water Repellency Test
Waterproof Test
2. Garment inspection procedure
After all materials are inspected by our office as above, we ship them to the factory warehouse.
1st step: QC inspect materials again before bulk.
2nd step: Make PPS with bulk materials.
3nd step: Adjust pattern according to shrinkage and PPS.
4th step: QC not only controls quality from cutting to the packing, but also guides workers to have correct artwork, color combination and good looking by better way.
5th step: QC tests waterproof 3 times at least each day.
6th step: QC inspects each product individual before shipping out.
7th step: QC supports and thanks to inspector from customers.